Bangladesh makes solar equipment recycling mandatory
The government of Bangladesh has made the recycling and disposal of waste generated by solar installations mandatory for manufacturers, suppliers and service providers under its Special Solar Power Installation Act, 2026.
The country’s parliament recently passed the legislation, with a gazette notification issued on Nov. 22.
Under the act, manufacturers, suppliers and service providers of solar panels and related equipment will be responsible for recycling equipment that reaches the end of its operational life or is damaged in accidents or natural disasters.
“A ‘Take-back Scheme’ will be implemented by the concerned manufacturer, supplier, or service provider to take back and manage machinery and equipment of the special solar power system when they become expired or unfit for use,” the act says.
The legislation also stipulates that a tripartite agreement will be signed between the consumer, the service provider and the relevant authority.
Bangladesh currently has no standalone policy governing the management of solar panel and related equipment waste. In its Renewable Energy Policy 2025, the Power Division said provisions for the sustainable disposal and recycling of batteries and PV panels would be incorporated into e-waste regulations by the Ministry of Environment.
Alamgir Hussain, a garment factory owner in Dhaka, welcomed the government’s initiative, warning that improperly managed solar waste could pose significant risks in the coming years.
“Many factories and private building owners are installing solar systems in the rooftops as the government declared incentives for the same. The wastes need proper disposal to avoid hazard,” he said.
Imran Chowdhury, deputy director (PIM) for Bangladesh at ib vogt APAC, said the rapid expansion of the global solar industry is shifting the discussion beyond capacity additions and cost competitiveness toward lifecycle sustainability and responsible solar asset management.
“In this context, it is encouraging to see Bangladesh addressing solar e-waste management through its new Special Solar Power Installation Act, 2026,” he told pv magazine.
Chowdhury said discussions in Bangladesh’s solar industry have largely focused on expanding installed capacity, with relatively little attention paid to managing solar equipment at the end of its operational life.
“The introduction of a Take-back Scheme is particularly noteworthy,” he added.
Given Bangladesh’s heavy reliance on imported solar equipment, however, Chowdhury said the practical implementation of the provision would be critical, particularly regarding whether international manufacturers would establish local take-back arrangements or whether responsibility would ultimately fall on local suppliers, distributors or project investors.
He added that clarity over who would bear the costs of collection, transportation, recycling and disposal would be equally important from an investor’s perspective, particularly for projects developed under the opex model.
“Furthermore, as Bangladesh aims to significantly scale up its renewable energy capacity, I believe a broader solar e-waste management framework covering utility-scale solar projects will also be necessary, particularly considering the volume of solar equipment these projects will bring into the country,” said Chowdhury.
