A modular common redundant power supply (MCRPS) has become a practical standard for enterprise server racks because it combines a compact mechanical envelope, redundancy support, and a common output interface across variants. At the same time, efficiency requirements are moving beyond traditional mid-load optimization. The result is a design environment where power density, transient response, and full-range efficiency must all be addressed together.

To target all of these requirements, Infineon Technologies has introduced a viable implementation of a 5.6 kW MCRPS design, targeting 170-W/in.3 power density and with an estimated peak PSU efficiency of >98% through a three-level flying-capacitor totem-pole power-factor-correction (PFC) stage and an isolated, GaN-based LLC converter. Integrated magnetics and advanced SiC, GaN, and silicon power devices reduce conversion losses and free valuable space for optimized cooling and component placement. An active energy buffer (EB) further supports a 12-ms holdup time while substantially reducing the required electrolytic capacitance.

AI computation is spreading across centralized data centers, enterprise infrastructure, and edge deployments. Training and large-scale inference remain concentrated in server facilities, while some latency-sensitive inference runs closer to the point of use, the so-called edge AI. The common engineering question for server infrastructure is how to deliver increasing computing capacity within practical limits on electrical input, rack space, cooling, and serviceability. The International Energy Agency reports that data center electricity demand rose by 17% in 2025, with AI-focused facilities alone growing by 50% and faster than data centers overall.1

At the server level, accelerator-intensive workloads can combine high sustained power with rapid changes in demand. An MCRPS provides a compact, replaceable building block for a redundant power architecture in which the server configuration, rather than the module alone, determines the available redundancy. Within the module, efficiency across the load range, thermal management, transient response, and holdup energy must be addressed together.


By Hubert Baierl, marketing director, Infineon Technologies AG  11.25.2026

MCRPS Power Supply for Enterprise Data Centers

By Antonello Laneve, Manuel Escudero, David Meneses, M.A. Kutschak, Theodoros Mouselinos, Alex Rossi, and Sam Abdel-Rahman, all at Infineon Technologies AG  11.25.2026

Understanding Accuracy and Resolution for Magnetic Angle Sensors

By Monolithic Power Systems, Inc. (MPS)  11.25.2026

Evolving efficiency requirements for MCRPS units

Two significant regulatory updates impact the efficiency targets across the entire load range. The 80 PLUS™ Ruby certification tier introduces a 5% load efficiency requirement and further increases the overall efficiency envelope compared with previous Titanium certifications.2

China’s mandatory GB 20943-2025 standard is scheduled to take effect on Feb. 1, 2027.3 Its efficiency grades (Table 1) add a second set of design thresholds for supplies within the applicable product category. Grade 1 represents industry-leading peak performance boundaries, and passing it is typically required for premium green certifications. This standard also has Grade 2, which represents a standard, high-efficiency baseline, as well as Grade 3, which defines the minimum allowable values such that any power supply that fails to meet Grade 3 is legally barred from factory distribution and market entry.

While these are distinct yet important programs, it is equally important to note that an efficiency target or estimate is not by itself evidence of certification or regulatory conformity.

To attain the premier Grade 1 efficiency classification and compliance with the ORv3 specification, hardware must demonstrate >92.0% at 10% load, >96.0% at 20% load, >98.0% at 50% load, and >96.5% at full power. A comparison of the efficiency requirements of all of the standards with Infineon’s estimated MCRPS efficiency is provided in Figure 1.

Estimated efficiency for the MCRPS 5.6 kW design and comparison of relevant standards.
Figure 1: Estimated efficiency for the MCRPS 5.6 kW design and comparison of relevant standards

Impacts of higher power and dynamic transient requirements for MCRPS units

Translating these requirements into a power supply delivering >5-kW output power means balancing overall power losses and cooling by ensuring sufficient airflow while storing the required amount of energy to sustain dynamic transients (e.g., during line-cycle dropout, or LCDO).

From a power loss point of view, having +54-V nominal output voltage means that the conduction losses in the synchronous-rectification (SR) path are an important contributor to overall system losses. Additionally, the power losses within the SR stage are concentrated in a very limited space, which complicates thermal management. As a result, the unit’s primary hotspot forms right where the secondary-side SR components are located. Therefore, the cooling strategy is critical and must consider sufficient airflow close to the LLC transformer (XFMR) and SR stage to ensure full-load thermal stability, as well as efficient heat extraction for the other semiconductors in the power supply.

Holdup time requirement greatly impacts the total volume of the MCRPS. A large passive capacitor bank stores energy but occupies precious volume to fit all required components in the MCRPS form factor (1U height and 185 × 73.5-mm width/length). An active EB circuit offers another design choice by allowing the extraction of more of the stored energy in the capacitors while the input voltage of the LLC converter remains within its operating range. This optimization avoids the need for oversized passive capacitor banks, freeing critical chassis space.

Infineon’s 5.6 kW MCRPS reference design and topology choices

Infineon’s reference design (Figure 2) targets 5.6 kW output and 170 W/in.3 in an MCRPS 185-mm form factor. Its two-stage power path combines a three-level flying capacitor totem-pole PFC front end (Figure 3) with an isolated LLC stage (Figure 4). The design targets a 54-V output, 180- to 305-VAC or 7240-VDC input, and a 12-ms holdup target at full output.

Existing 3D view of the reference design component arrangement.
Figure 2: Existing 3D view of the reference design component arrangement
Implementation of PFC AC/DC converter and energy buffer in the 5.6 kW MCRPS unit.
Figure 3: Implementation of PFC AC/DC converter and energy buffer in the 5.6 kW MCRPS unit
Implementation of LLC DC/DC converter in the 5.6 kW MCRPS unit.
Figure 4: Implementation of LLC DC/DC converter in the 5.6 kW MCRPS unit

In the PFC stage, 650 V CoolSiC™ devices are used in the high-frequency leg and 650 V CoolMOS™ Gen 8 devices in the line-frequency return path. Compared with a two-level two-phase interleaved totem-pole implementation, a three-level flying-capacitor (3LFC) topology excites the PFC inductor with half the voltage and double the frequency. This divides by four the voltage-time window applied at the choke terminals, allowing a significant shrinking of the volume of the inductor. Furthermore, the phase shift modulation in 3LFC allows the two topologies to have the same input current ripple even if the three-level implementation has only one phase, reducing the number of large magnetic components.

The LLC stage steps the intermediate Vdc+ high-voltage bus down to the 54-V rail, as shown in Figure 4. 650 V CoolGaN™ switches are used in the LLC primary side, while 80 V CoolGaN™ devices on the secondary side are chosen due to lower RDS(on) than existing silicon FETs and increased full-load efficiency with a lower number of parts in parallel.

Additionally, the low gate charge and output capacitance of GaN devices help to limit gate drive and switching-related losses, resulting in higher efficiency over the full-load range when compared with other switching technologies. Moreover, the reduction of the switch output capacitance enables lower zero-voltage switching (ZVS) energy and therefore enabling lower required magnetizing currents for the same ZVS time.

Integrating the resonant inductor, the magnetizing inductance, and the SR stage into the same transformer reduces the need for separate magnetic packages, limits AC conduction losses, and reduces volume. Also, in this case, the volume gain can be used to improve airflow and increase heatsink cooling surfaces for rapid heat extraction and stable thermal behavior in nominal full-load operating conditions.4

The peak efficiencies for the PFC and LLC stages have been theoretically estimated to be 99.2% and 99.0%, respectively, open-chassis and excluding fan power, and will be proven experimentally on the MCRPS unit. Under these assumptions, the expected PSU peak efficiency is >98%. This would meet 80 PLUS Ruby and Grade 1 efficiency requirements of the GB 20943 standard.

Energy buffering to meet holdup time requirement

At 5.6 kW, 12-ms grid outage corresponds to approximately 67 J of stored holdup energy to be able to keep providing full power to the load. A conventional approach would rely on substantial bulk capacitance to limit the DC-link voltage drop during LCDO. For example, in a standard 5.6 kW design, if during LCDO the bulk is allowed to drop from 435 V to 350 V, the required amount of capacitance to store the holdup energy is 2.0 mF.

The proposed reference design reduces the electrolytic bank’s overall volume by integrating a bidirectional active EB auxiliary circuit, as shown in Figure 3. This circuit decouples the intermediate bus voltage from the LLC input voltage Vdc+, enabling a lower minimum voltage of the electrolytic capacitor. In this case, if the voltage on the electrolytic capacitor is allowed to drop from 435 V to a lower voltage (e.g., 270 V), then the required amount of capacitance to store the holdup energy is just 1.15 mF.

Evidently, from the analysis before and considering a typical energy density of 2 J/cm3, using the EB approach reduces the size of the electrolytic bank by a factor of 2. Note that this reduction does not account for the extra inductor required to operate the EB or the associated semiconductors needed for circuit operation. However, the inductor size is very limited because it does not operate in steady-state, and the semiconductors can be integrated into the main board, so the extra volume occupation does not change the picture significantly. Indeed, the estimated fractional factor changes from 2× to roughly 1.8×, considering an additional inductor total size of 26 × 26 × 10 mm, making the EB approach very attractive for addressing dynamic transients.

Aside from the clear volume advantage in the MCRPS chassis, the EB brings other advantages. For example, it narrows the input voltage range of the LLC converter and possibly optimizes the design for even higher efficiency. In other words, it supplies energy during brief grid interruptions (LCDOs) or voltage sag without requiring the LLC conversion stage alone to absorb the full transient.5

Additionally, the EB stage avoids the need for re-rush circuits immediately after the LCDO events because the EB can also implement a soft-charge functionality of the electrolytic capacitor bank without additional high-impedance charging paths.

Implications for next-generation MCRPS units

The upcoming 5.6 kW MCRPS reference design from Infineon provides a viable solution for the next generation of common redundant PSUs in enterprise servers and edge AI. By combining high-efficiency, 8three-level PFC, a high-frequency LLC stage, and a novel EB concept, a very compact and high-efficiency design can be achieved while complying with stringent new regulations, such as the 80 PLUS Ruby specification and China’s GB 20943-2025, and tackling dynamic transient requirements.

Chassis airflow optimization is maximized by replacing traditional, two-level interleaved PFC employing dual chokes with a three-level flying capacitor topology that requires only a single choke, significantly reducing the volume occupied by the front-end converter magnetics. In addition, the use of a high-frequency LLC converter and an integrated planar transformer further minimizes the converter’s volume within the chassis.

These design choices enable the MCRPS to achieve a benchmark power density of 170 W/in.3 while delivering 5.6 kW of output power and meeting all dynamic requirements, including a 12-ms holdup time.


References

1International Energy Agency. (April 16, 2026). Press release. “Data centre electricity use surged in 2025, even with tightening bottlenecks driving a scramble for solutions.”

2CLEAResult. “What do the different PSU (power supply units) ratings mean?”

3National Public Service Platform for Standards Information (China). (2025). GB 20943-2025.

4Kutschak et al. (October 2025). “Design of High-Density and High-Efficiency 8kW LLC converter.” PCIM Conference 2025 International Exhibition and Conference for Power Electronics, Intelligent Motion, Renewable Energy and Energy Management, pp. 3002–3010.

5Infineon Technologies AG. (November 2025). Application Note AN133109. “Energy buffer circuit for hold-up extension and grid current shaping in AI data centers and servers.”

6Infineon Technologies AG. (February 2026). Application Note AN145544. “3.3 kW high-frequency and high-density PSU for server and datacenter applications.”


Also read:
EE Times Magazine - November 2026 Edition - Cover

EE Times Magazine – November 2026

This edition of EE Times Magazine explores advances in semiconductor manufacturing and packaging, farm autonomy, and Canada’s efforts to commercialize emerging technologies.

DATA CENTERS, GALLIUM NITRIDE, POWER SUPPLY

INFINEON TECHNOLOGIES