The home battery location when building a new home is usually the last thing anyone decides (unfortunately). By that time, the plasterboard is up, and the obvious wall turns out to be backing onto a bedroom, most likely close to a door, or exactly where the car pulls in.
It doesn’t seem like a problem until it’s there, and it’s more expensive to fix compared to having a space for it before the walls go up. The costs may involve a lot of things, like a fire-rated lining, a longer cable run, a bollard, and a variation on the building contract. On the other hand, marking the spot on the plans even before the frame stage costs close to nothing.
As more and more batteries are getting installed under the federal rebate since July 2025, the most common question popping up now for builders is about storage. The rules they work from come from AS/NZS 5139, the Australian standard for battery installations, and an amendment published in December 2025 changed some of them, including how close a battery can sit to a garage door.
Quick summary
- Batteries can’t go in habitable rooms, ceiling spaces, under stairs or in escape routes, and they need clearance from exits, doors, and openings.
- The cheapest time to plan the location is before frame stage, when timber backing, barrier lining and conduit cost very little.
- Amendment 1 to AS/NZS 5139 now allows a battery within 600 mm of an opening wider than 900 mm, such as a garage door, which opens up more garage layouts.
Why battery location needs deciding at design stage
There’s quite a lot that has to be done when you install a battery. You need a compliant wall, a structural backing, a cable route to the switchboard and inverter, and in some cases, a barrier or collar. The good thing is, all of these things are simple when the frame is open.
Another important factor is the weight, as many popular home batteries weigh well over 100 kg, and larger modular systems can pass 200 kg. With that, the wall must have solid timber backing instead of plasterboard alone. On the other hand, adding that later means cutting into a finished wall.
The contract is another consideration. If battery isn’t on the plans, adding it during the build is usually a variation, and usually, it is paid by the owner.
Expert tip
Ask for the battery to be drawn on the plans with a label and dimensions before you sign the building contract. If it isn’t on the drawings, assume it hasn’t been planned.
Where a battery can’t go
AS/NZS 5139 sets out restricted locations for home batteries. In a typical house, that rules out:
- Habitable rooms: ERAC, the national body that coordinates electrical regulators, says this includes bedrooms, studies and home offices, living and family rooms, kitchens and dining rooms.
- Ceiling spaces and wall cavities.
- Under stairs and walkways.
- Escape routes, such as hallways and corridors people use to get out of the house.
- Near exits and entries, where the standard sets minimum clearances.
- On roofs
The restrictions are built around a rare but serious failure called thermal runaway, where a faulty or damaged cell overheats and sets off the cells around it. It can release flammable and toxic gases and start a fire that’s hard to put out. Most of the location rules follow from that. Barriers slow heat from reaching a living space, clearances stop doors, windows and vents from becoming a path for smoke and gas into the house, and ceiling spaces are off-limits because a fire there could spread unseen.
Expert tip
Check the room labels on your plans. A “study nook,” “rumpus” or “media room” counts as habitable, and so does a garage that’s been designed to double as a home office.
The best locations in a new home
Garage
An obvious spot in the home, especially for new homes, the garage is the most compliant spot. Nobody lives there, it’s close to the switchboard in most designs, and it’s protected from the weather. But it’s not all perfect – the catches are the wall behind it, the car, and the heat. If the garage gets hotter than outside in the summer, then it’s a bad spot for a battery, and a wall shared with a bedroom or living area may need a barrier.
External wall
An outside wall can work well, especially if the home doesn’t have a garage. Ideally, the area should be shaded and out of the afternoon sun. Check that the battery is rated for outdoor installation and keep it clear of windows, doors, and vents.
Service areas
Some homes have a dedicated plant or services area. These areas can be a good spot for a battery, but the clearance and wall rules still apply, so confirm with your installer before planning a battery inside the house.
Expert tip
The ideal wall has a non-habitable room behind it, such as a garage, store room or laundry. That way, you avoid the cost of barrier lining between the battery and a living space.
Clearances and protection to plan for
Clearance from exits, doors and openings
AS/NZS 5139 sets minimum clearances between a battery and exits, doors, windows and building ventilation. The most commonly quoted distance is 600 mm, but the exact distances depend on the battery and the layout and are set out in figures within the standard, so your installer should confirm them for the specific product.
The 2025 amendment has also changed how inverters are treated. They’re now counted as an associated appliance and can sit within the battery’s restricted location, which makes it easier to mount the inverter and battery side by side.
The garage door change
Amendment 1 to AS/NZS 5139 was published on 19 December 2025. One of its most useful changes for new homes is that a battery can now be installed within 600 mm of an opening if that opening is wider than 900 mm.
In practice, the wall beside the garage door, which was often ruled out before, may now be an option. That’s handy in narrow garages where the side walls are taken up by storage, a laundry or the internal access door.
Protection from the car
If a vehicle could reach the battery, it needs fixed protection. Solar Victoria’s guidance on common installation defects is clear that shelving or other non-fixed objects don’t count. Bollards on either side, or a U-shaped bollard around the front, are the usual answer. In a standard garage, pillar walls near the door can sometimes provide that protection on their own.
Barriers where a living space is behind the wall
If a habitable room sits on the other side of the battery wall, a barrier is needed between them. The amendment tightened the rules on barrier materials, which must now be at least 6 mm thick. Materials within a metre of certain battery types also have new requirements.
Expert tip
Leave room for a second battery module, even if you only install one now. A spare 600 mm of clear wall and an oversized conduit cost nothing at frame stage and save a relocation later.
What to add at frame stage
Once the location is agreed, ask your builder to include:
- Timber backing in the wall where the battery will hang, rated for its weight.
- Barrier lining if a habitable room is behind the wall.
- Conduit from the battery position to the switchboard and inverter, sized for future upgrades.
- A data cable for monitoring and, if you plan to join a VPP, reliable internet.
- Space for isolators and any required signage beside the battery.
- Bollard footings in the slab, if the battery will be within reach of the car.
- A clear zone marked on the plans, so no one adds a tap, vent or shelving there later.
Expert tip
Ask your builder to take a photo of the framing, backing and conduit before the plasterboard goes on. Keep the photos with your house documents. Your installer and any future buyer will thank you.
Questions to ask your builder and installer
- Who chooses the battery location, and has the battery installer seen the plans?
- Is the location marked on the drawings, with clearances shown?
- Which edition of AS/NZS 5139, including Amendment 1, is the design based on?
- Who certifies that the location complies?
- If the location fails inspection, who pays to fix it?
Expert reference
The NSW Government says the amendment is now mandatory, that installations not meeting the updated requirements may not comply with the standard, and that electricians should check the requirements before finalising the installation location.
Building a new home?
Get battery quotes from accredited installers who’ll review your plans and choose a compliant location before frame stage.
Frequently asked questions
Can a home battery be installed inside the house?
Generally not in living spaces. AS/NZS 5139 rules out habitable rooms such as bedrooms, living areas, kitchens and studies, as well as ceiling spaces, the area under stairs and escape routes. Some non-habitable internal spaces can work with the right clearances and walls, but most new homes put the battery in the garage or on an external wall.
Can I put a battery in my garage?
Yes. A garage is non-habitable, which makes it the most common location in new homes. You’ll still need the right clearances from doors and openings, fixed protection if a car could hit it, and a barrier if a living space is on the other side of the wall. Avoid garages that get very hot.
How far does a battery need to be from a door or window?
The standard sets minimum clearances to exits, doors, windows and vents, commonly 600 mm, with exact distances depending on the battery and layout. Since Amendment 1 to AS/NZS 5139, a battery can sit within 600 mm of an opening wider than 900 mm, such as a garage door. Your installer should confirm the clearances for your product.
Do I need a bollard for a garage battery?
If a vehicle could reach the battery, yes. Solar Victoria’s guidance says fixed mechanical protection is needed, and shelving or other movable objects don’t count. Bollards on each side or a U-shaped bollard are common. In some standard garages, the pillar walls beside the door can provide enough protection without extra bollards.
What happens if my battery location fails inspection?
The installation can’t be signed off until it’s fixed, which might mean adding a barrier, fitting bollards, rerouting cables or moving the battery altogether. On a new build, who pays depends on your contract. If the location was agreed and drawn on the plans, you’re in a far stronger position than if it was left to sort out later.
Key takeaways
- Decide the battery location at design stage, and get it drawn on the plans before you sign the building contract.
- Batteries can’t go in habitable rooms, ceiling spaces, under stairs or in escape routes.
- The garage is usually the easiest spot, but plan for clearances, the wall behind and protection from the car.
- Amendment 1 to AS/NZS 5139 now allows a battery within 600 mm of an opening wider than 900 mm, such as a garage door.
- Add backing, barrier lining, conduit and bollard footings at frame stage, when they cost the least.